Hensley-Chandler Facility

Project included 155,000 ft warehouse, 32,500 ft of two-story office space, and a separate 16,200 ft maintenance facility. Construction included the use of concrete tilt-up “sandwich panels.” These panels include a layer of insulating foam “sandwiched” between a structural panel and a non-structural outer layer. The roofs and floors were framed with steel joists, beams, and girders. The building included a large rail dock and steel framed shade canopy.